Current location of water allocations in the St George Water Supply Scheme

A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will be approved.

If an application to change the location of a water allocation would cause the maximum and minimum constraints to be exceeded, then individual assessments and public advertisements are required.

HIGH priority water allocations (ML)
ST GEORGE WATER SUPPLY SCHEME Nominal Volumes as at COB 19th May 2013
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
LBS-01 0 390 390 390
LBS-02 0 2,610 2,610 2,610
All values in Megalitres

* This represents the forecasted 'current volume' assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

MEDIUM priority water allocations (ML)
ST GEORGE WATER SUPPLY SCHEME Nominal Volumes as at COB 19th May 2013
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
LBS-01 0 33,244 81,575 33,244
LBS-02 0 40,586 81,575 40,586
LBS-03 ** 3,619 4,615 5,619 4,615
LBS-04 0 3,130 3,130 3,130
All values in Megalitres

* This represents the forecasted 'current volume' assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

** The minimum total nominal volume does not apply to a water allocation with a nominal location of zone LBS-03 if the nominal volume of the water allocation at the commencement of the Condamine and Balonne Resource Operations Plan 2008 is less than or equal to 25 megalitres.

Last updated 4 June 2010