Ibis Dam Independent Technical Review

Report prepared by AECOM Australia Pty Ltd. AECOM were engaged by the department in August 2011, to carry out an independent engineering assessment of the recent conclusions drawn by SunWater with regard to the stability and structural integrity of Ibis Dam. In addition, AECOM was also required to comment on SunWater's assessment of acceptable flood capacity for the dam and to provide a recommendation on possible lowering of the water level in the dam by 6m during the 2011/2012 wet season.

Availability Price
Online (PDF, 1.52 MB)* Free
Date published:
30 August 2011

* Requires Acrobat Reader

Resource centre