January 2011 Flood Event: Report on the Operation of North Pine Dam
Report by Seqwater on the operation of North Pine Dam. The submission of this report by Seqwater to the department is a requirement of the Manual of Operational Procedures for Flood Mitigation at North Pine Dam. The Seqwater report addressed matters including a summary of the flood event, the operations of the flood operations centre, data collection and communications, conclusions about compliance, and recommendations for a formal review of the manual which will occur under standard requirements following an event of this nature.
| Availability | Price |
|---|---|
| Online (PDF, 6.61 MB)* | Free |
- Date published:
- 11 March 2011
- More information:
- North Pine Dam
* Requires Acrobat Reader

